MEP Project Risk Management: Avoiding cost overruns and technical failures
MEP Project Risk Management: Avoiding cost overruns and technical failures
$38.99List $39.99Save 3%Paperback
In stock, ships in 1-2 business days
Free standard shipping on orders over $40. ISBN 9798271818073
1
Details
- Format
- Paperback
- ISBN-13
- 9798271818073
- Publisher
- Independently Published
- Published
- October 27, 2025
- Pages
- 132
- Weight
- 6.6 oz
- Subject
- Technology & Engineering
More by Charles Nehme
All books
How to Liquid Cool a Data Center: Practical Design, Implementation, Operation, and Optimization of Data Center Liquid Cooling Systems
Charles Nehme
$238.99

Electrostatic Precipitators (ESPs): Design, Operation, Applications, Integration with Scrubbers, and Practical Engineering
Charles Nehme
$52.99

Packed Bed Scrubbers: Design, Operation, Applications, and Engineering Practice
Charles Nehme
$52.99

Hotel Water Recycling, Reuse & Rainwater Systems: Sustainable Water Management, Treatment, Recovery, and Engineering Practice
Charles Nehme
$52.99

Venturi Scrubbers: High-Energy Wet Gas Cleaning, Design, Operation, Applications, and Engineering Practice
Charles Nehme
$52.99

Spray Tower Scrubbers: Design, Operation, Pollution Control, and Practical Engineering Applications
Charles Nehme
$52.99

Fundamentals of Heating, Ventilation, and Air Conditioning: A Practical Guide to HVAC Systems and Engineering Principles
Charles Nehme
$29.99

Sustainable HVAC: Beyond Energy Efficiency
Charles Nehme
$52.99

Strategies for Mitigating Airborne Pathogen Transmission Using Advanced UVGI Engineering Solutions
Charles Nehme
$52.99

Chemical Plant HVAC Systems: Design, Safety, Ventilation, and Operational Engineering
Charles Nehme
$52.99

Microgrid Integration Protocols for Critical Hospital Standby Cooling and Ventilation Systems: Microgrid-to-Chiller Transfer Sequencing, BSL-4 Pressur
Charles Nehme
$52.99

Kitchen Exhaust Ventilation Hood Design and Fire Suppression Engineering Integration: Commercial Kitchen Airflow Dynamics, Grease Extraction, NFPA 96
Charles Nehme
$52.99
Popular in Technology & Engineering
Browse Technology & Engineering
Kobuk the Destroyer: And Other Tales from the Wild, Unseen World of Test Engineering
Alex Davies
$23.99

The Collision: What AI Does to Us
Eric C. So
$23.99

Rise of the Robots: Technology and the Threat of a Jobless Future
Martin Ford
$17.99

Wired Wisdom: How to Age Better Online
Eszter Hargittai
$16.99

The Secret Life of Circuits: An Illustrated Guide to Electronic Circuit Design
Michal Zalewski
$31.99

Mothers of Invention: A History of Creativity from the Greek Muses
Moiya McTier
$22.99

Invent Now: The Next Leap in Moonshots
Salima Bhimani
$27.99

Contracting for Integrated Project Delivery: Structuring Collaborative Projects for Global Success
Howard W. Ashcraft
$80.99

Localization in Wireless Networks: Technologies and Applications
Nasir Saeed
$136.99

Advanced Fault Current Limiters: Definition, Design, and Future Trends
Amir Heidary
$136.99

Computational Chemical Reaction Engineering: Modeling, Simulation, and Design with MATLAB
Kamal I. M. Al-Malah
$168.99

Cyber-Secure Load Frequency Control for Power Systems
Xinghua Liu
$140.99