Data Center Construction Management Frameworks: Governance, Master Schedule, EVM Dashboard, Mission Critical QA/QC, Integrated Systems Testing, Procur
Data Center Construction Management Frameworks: Governance, Master Schedule, EVM Dashboard, Mission Critical QA/QC, Integrated Systems Testing, Procur
$52.99Paperback
In stock, ships in 1-2 business days
Free standard shipping on orders over $40. ISBN 9798198546776
1
Details
- Format
- Paperback
- ISBN-13
- 9798198546776
- Publisher
- Independently Published
- Published
- May 25, 2026
- Pages
- 616
- Weight
- 28.6 oz
- Subject
- Technology & Engineering
More by Balachander Subramanian
All books
The Complete Data Center Inspection and Quality Control Manual: A Comprehensive Technical Guide to Construction Inspection, QA/QC, Testing, Commission
Balachander Subramanian
$38.99

The Complete Building Inspection and Quality Control Manual: A Complete Guide to Structural, Architectural and MEP Inspections, Construction Quality C
Balachander Subramanian
$38.99

Qa/Qc Plans, Itps, Inspection Checklists, Testing Forms, Ncrs, Quality Audits: A practical toolkit for planning, inspecting, testing, documenting, aud
Balachander Subramanian
$38.99

Construction Qa/Qc Inspection Handbook: A Comprehensive Guide to Quality Assurance, Quality Control, Inspection, Testing and Quality Management for Co
Balachander Subramanian
$38.99

Construction Automation Handbook - Volume 5: Covering human-robot collaboration, workforce transformation, risk and cybersecurity, standards and contr
Balachander Subramanian
$38.99

Construction Automation Handbook - Volume 4: Smart and autonomous construction sites through robotics, logistics, safety, quality, high-rise and infra
Balachander Subramanian
$38.99

Construction Automation Handbook - Volume 3: Workflows, architectures, implementation strategies, productivity, quality, safety, risk, cost, schedulin
Balachander Subramanian
$38.99

Stormwater Engineering Handbook - Volume 5: Advanced Modeling, Resilience, Smart Systems and the Future of Stormwater Engineering
Balachander Subramanian
$38.99

Stormwater Engineering Handbook - Volume 2: Covering stormwater drainage planning, urban drainage hierarchy, design criteria, surveys, GIS/terrain mod
Balachander Subramanian
$38.99

Wastewater Engineering Handbook - Volume 5: Operation, Resilience, Smart Infrastructure, Integrated Design and the Future of Wastewater Engineering
Balachander Subramanian
$38.99

Wastewater Engineering Handbook - Volume 4: Covers wastewater reuse, industrial treatment, resource recovery, sustainability, and decentralized system
Balachander Subramanian
$38.99

Wastewater Engineering Handbook - Volume 3: Covers secondary clarification and solids management followed by tertiary and advanced wastewater treatmen
Balachander Subramanian
$38.99
Popular in Technology & Engineering
Browse Technology & Engineering
The Beekeeper's Handbook
Diana Sammataro
$23.99

Kobuk the Destroyer: And Other Tales from the Wild, Unseen World of Test Engineering
Alex Davies
$23.99

The Collision: What AI Does to Us
Eric C. So
$23.99

An Author's Guide to Setting Design: Worldbuilding & Cartography
Adam Bassett
$55.99

Rudimentary Treatise on the Construction of Locks
A. C. Hobbs
$19.99

Emulsifiers and Surfactants in Bakery and Confectionery Products: Functionality and Applications
Hadi Hashemi
$284.99

Regulatory Framework for Postharvest Horticultural Fresh Produce and Trade Practices
Deepak Kumar
$217.99
![Sewage and sewerage of farm homes [1928] cover](/covers/200/9789309334344.jpg)
Sewage and sewerage of farm homes [1928]
George M. Warren
$14.99

AI for Biomedical Research Volume 1: From Idea to Analysis
Molly Klote
$88.99

Brazil's Stem Horizon: Women Shaping Scientific Futures
Rakesh Kumar
$217.99

Carrots, mangold wurtzels and sugar beets: How to raise them, how to keep them and how to feed them
James J. H. Gregory
$14.99

Advanced Concepts and Technologies for Electric Aircraft: Power Systems and Energy Management
Akshay Kumar Rathore
$217.99