nextRead
NASA Work Breakdown Structure (WBS) Handbook: NASA SP-2016-3404 Rev.1

NASA Work Breakdown Structure (WBS) Handbook: NASA SP-2016-3404 Rev.1

by NASA

$25.99List $26.35Save 1%Paperback

In stock, ships in 1-2 business days

Free standard shipping on orders over $40. ISBN 9781795700207

1

Details

Format
Paperback
ISBN-13
9781795700207
Publisher
Independently Published
Published
February 2, 2019
Pages
70
Weight
8.8 oz
Subject
Technology & Engineering

More by NASA

All books
Moon to Mars 2024 Architecture Concept Review White Papers cover

Moon to Mars 2024 Architecture Concept Review White Papers

NASA

$19.99

Spacecraft and Rockets: Photographs from the Archives of NASA

Spacecraft and Rockets: Photographs from the Archives of NASA

NASA

$27.99

Feasibility Study of A Satellite Solar Power Station

Feasibility Study of A Satellite Solar Power Station

NASA

$46.99

State-Of-The-Art Small Spacecraft Technology 2023

State-Of-The-Art Small Spacecraft Technology 2023

NASA

$80.99

History of On-Orbit Satellite Fragmentations, 16th Edition

History of On-Orbit Satellite Fragmentations, 16th Edition

NASA

$105.99

A Time Traveler's Journal

A Time Traveler's Journal

NASA

$23.99

International Space Station Benefits for Humanity (Second Edition)

International Space Station Benefits for Humanity (Second Edition)

NASA

$29.99

Force Limited Vibration Testing: NASA-HDBK-7004c

Force Limited Vibration Testing: NASA-HDBK-7004c

NASA

$25.99

Low Earth Orbit Spacecraft Charging Design Handbook: NASA-HDBK-4006a

Low Earth Orbit Spacecraft Charging Design Handbook: NASA-HDBK-4006a

NASA

$26.99

Nondestructive Evaluation Requirements for Fracture-Critical Metallic Components: NASA-STD-5009a

Nondestructive Evaluation Requirements for Fracture-Critical Metallic Components: NASA-STD-5009a

NASA

$18.99

Fracture Control Requirements for Spaceflight Hardware: NASA-STD-5019a

Fracture Control Requirements for Spaceflight Hardware: NASA-STD-5019a

NASA

$18.99

Structural Design and Test Factors of Safety for Spaceflight Hardware: NASA-STD-5001b

Structural Design and Test Factors of Safety for Spaceflight Hardware: NASA-STD-5001b

NASA

$16.99

Popular in Technology & Engineering

Browse Technology & Engineering